

Melbourne water damage response.
Built for the claim.
IICRC-certified technicians for water make safe and structural drying across Category 1 and 2 losses. Fast attendance, controlled drying and reporting your assessor can work with.
Done properly.
Documented clearly.
Floex is built for the handover moment: when a site needs to be safe, dry and defensible before the claim moves on.
We keep the scope tight, the communication direct and the evidence clean from first attendance to final report.
- 01Make the site safe
- 02Control the drying
- 03Hand over the evidence

Focused water damage response for Category 1 and 2 losses, minor mould treatment and controlled drying. Every job is scoped, monitored and documented to insurance standard.
- 01
Water Make Safe
- First attendance after water intrusion.
- Loss category assessed, standing water extracted and affected areas contained before damage spreads.

- 02
Structural Drying
- Walls, floors or cavities hold moisture.
- Commercial drying equipment deployed to AS-IICRC S500 standard, with readings logged throughout.

- 03
Mitigation
- The site needs stabilising before reinstatement.
- Unaffected areas protected, drying environment set and builders given a clean handover.

- 04
Mould Treatment
- Minor mould is present after a water loss.
- Approved containment and treatment steps completed, with site conditions documented before and after.

- 05
Antimicrobial Treatment
- The loss category or contamination risk calls for it.
- Controlled surface treatment applied and recorded as part of the job file.

The job file is the product.
Drying matters. So does the handover. Floex closes each job with the evidence assessors and builders need to keep the claim moving.

- 01
Moisture map
Affected rooms, materials and cavities recorded so the drying scope is visible.
- 02
Drying log
Moisture readings tracked through the job, not reconstructed at the end.
- 03
Photo record
Site condition, affected areas, equipment placement and completion evidence captured in sequence.
- 04
Equipment register
Dehumidifiers, air movers and meters recorded against the job file for a clean audit trail.
- 05
Final scope report
A concise handover that gives the assessor or builder the evidence they need to move.